News & Articles
27 Feb

Davao International Port Upgrading Project

Mlion Corporation worked with Davao International Container Terminal (DICT) to provide sheet piles for their project. Design and discussions started from early 2019 and with consultant to provide the best possible solution for the project. MHZ sheet piles in pairs were painted and coated and delivered to site. The project required reclamation works to be done on an extension of their existing berth. Reclamation will prevent scouring from oncoming vessels when the pier is built.

 

Piles Supplied:

MHZ24-2 in 12m and 16m

MHZ20-1 in 11m / 12m / 14m / 16m

Coating of Sigmacover 850

CP1 Corner Piles for the project.

 

Project was piled by Maximus Structural in Davao.

 

 

 

On Company Announcements, Construction, Sheet Piles